Florida Power and Light/Florida Gas Transmission

TroyConstruction2

Owner:
Florida Power and Light/Florida Gas Transmission 

Construction Management & Engineers:
Troy Construction

UPI

Location:
Indiantown, FL

Project Size:
$592,567.00

Project Delivery:
E&I Construction 

Completion:
October 2013

E&I Construction of the Riviera Beach Energy Center Riviera West Metering and Regulation Station.  Chewning & Wilmer’s scope of work was installation of:

  • Power distribution equipment
  • Control system equipment
  • Field instrumentation control wiring and  process and instrument tubing
  • Underground and above ground conduit system for power and grounding system
  • Lightning protection
  • Energy isolation devices
  • Process Area lighting
  • Safely execute project as part of a project team that had schedule and weather obstacles to overcome.